DPWH KICKS-OFF JICA-FUNDED MINDANAO ROAD NETWORK PROJECT

by Philippine Resources - December 07, 2022

Photo credit: Department of Public Works and Highways

The Department of Public Works and Highways (DPWH) is now working on projects that will address the deficit of road network in the Bangsamoro Autonomous Region in Muslim Mindanao (BARMM).

Simultaneous to DPWH Senior Undersecretary Emil K. Sadain’s participation at the 12th Intergovernmental Relations Body (IGRB) Meeting of the National Government and Bangsamoro Government in Davao City, the DPWH Unified Project Management Office (UPMO) Roads Management Cluster 1 (Bilateral) held a kick-off meeting in Cotabato City with the key project stakeholders to formally introduced the Japan International Cooperation Agency (JICA)-funded Road Network Development Project in Conflict Affected Areas in Mindanao (RNDP-CAAM).

In his report to Secretary Manuel M. Bonoan, Senior Undersecretary Sadain said that the kick off meeting organized by UPMO RMC1 Project Director Benjamin A. Bautista and Project Manager Francisco M. Sawali was an opportunity to define the important roles that the various stakeholders especially the local government units (LGUs) will play in the project implementation.

The stakeholder consultation held December 1, 2022 provided an overview of the project for government agencies and LGUs, introduce key personnel and project team members, and enjoin their cooperation.

Project Director Bautista, Project Manager Sawali, and the consultants of consulting services firm CTI Engineering International Co. Ltd and Oriental Consultants Global Co. Ltd explained to the stakeholders the background of four (4) road sub-projects under RNDP-CAAM with a total length of 77 kilometers.

The kick-off meeting has provided local leaders and other stakeholders of an update of the detailed engineering works on the 35.30-kilometer Parang-Balabagan Road, 19.80-kilometer Marawi City Ring Road, 7-kilometer Parang East Diversion Road, and the 16.80-kilometer Manuangan-Parang Road.

This kick-off activity is crucial to level off key stakeholders’ expectation, gain the cooperation for the smooth implementation, properly plot timelines, and know the necessary coordination and other logistical requirements that must be considered moving forward, added Senior Undersecretary Sadain.

The stark contrast of Mindanao’s growth potential and the status as one of the poorest is in dire need of infrastructure development intervention.

RNDP-CAAM will complement the progress of the peace and unity process by way of addressing the shortage of infrastructure in the Bangsamoro Region.

The project is in line with the trust of the government to encourage economic development, reduce poverty and contribute in the government effort to peace development in the conflict-affected area in Mindanao.

 

Article courtesy of the Department of Public Works and Highways


Place your Ad Here!


Related Articles

Construction

Philippine Resources - July 16, 2021

Duterte Opens New Expressway in Central Luzon

Motorists will now be able to use the first 18-kilometer portion of the Central Luzon Link Expressway (CLLEX) from SCTEX/TPLEX connection in Tarlac City up to the intersection of Aliaga-Guimba Road in Aliaga, Nueva Ecija. President Rodrigo Duterte, Department of Public Works and Highways (DPWH) Secretary Mark Villar, Senator Bong Go, and Japanese Ambassador to the Philippines Kazuhiko Koshikawa led on Thursday the inauguration ceremony of the four lanes toll-free expressway project connecting the provinces of Tarlac and Nueva Ecija. The initial part of CLLEX that will be opened are the following sections covered by three contract packages: 4.10 kilometer Tarlac Section, 6.40 kilometer Rio Chico River Bridge Section including the 1.5 kilometer Rio Chico Viaduct, and Aliaga Section with up and down ramps at Guimba-Aliaga Road. This new highway project was implemented by DPWH Unified Project Management Office (UPMO) led by Undersecretary Emil Sadain and Project Director Benjamin Bautista of UPMO Roads Management Cluster 1 (Bilateral) who have worked double-time to deliver the completion of this project. CLLEX is among the key infrastructure projects with funding assistance from the Government of Japan thru the Japan International Cooperation Agency (JICA) in support of the Build, Build, Build program. The entire 30-kilometer expressway project is expected to shorten the usual travel time of 70 minutes between Tarlac City and Cabanatuan City to just 20 minutes. More than just scenic views experienced while you drive and visit the stunning places in Central Luzon, this new highway will help ensure the Philippines’ sustainability and development by addressing barriers in distance and mobility. The Build, Build, Build program continues to deliver its promise of creating infrastructure that improves the lives of Filipinos in the face of the Covid-19 pandemic and other challenges. While Build, Build, Build continued to make progress, it is also setting up the foundation in terms of infrastructure for the next generation.

Construction

Philippine Resources - July 16, 2021

Duterte: New Tarlac-Cabanatuan Expressway to Boost PH Economy

By Ruth Abbey Gita-Carlos

Construction

Philippine Resources - June 09, 2021

CLLEX up to Aliaga will open this July

Photo Credit: Department of Public Works and Highways Public Works and Highways Secretary Mark A. Villar expressed confidence that the Central Luzon Link Expressway (CLLEX) will be an efficient alternate route for the motoring public going to Nueva Ecija when it opens next month. Despite work slowdown due to the pandemic, the first 18-kilometer segment of CLLEX will be of service to motorists from SCTEX/TPLEX connection in Tarlac City up to the intersection of Aliaga-Guimba Road in Aliaga, Nueva Ecija this July 2021, declared Secretary Villar. Secretary Villar said that contract packages 1 and 2 covering Tarlac Section and Rio Chico River Bridge Section having a combined length of 10.5 kilometers are already completed while construction of 9.2 kilometers contract package 3 - Aliaga Section is 87 percent finished. Secretary Villar together with Undersecretary for Unified Project Management Office (UPMO) Operations Emil K. Sadain and Region 3 Director Roseller Tolentino personally checked on Tuesday, June 8, 2021 the project’s progress which already has an overall accomplishment of 94 percent, making sure that the road is built with quality construction materials and specifications. Construction of the ₱11.811 Billion road project funded by loan with Japan International Cooperation Agency is implemented by UPMO-Roads Management Cluster 1 headed by OIC Project Director Benjamin C. Bautista. In his report to Secretary Villar, Undersecretary Sadain said that the delivery of right of way (ROW) requirements are being fast-tracked, with the assistance of the Office of the Solicitor General (OSG) for expropriation complaints and other ROW-related cases. “We are hopeful that we will finally secure full site possession of the remaining required ROW to allow our construction activities to go on full throttle”, added Undersecretary Sadain. Expropriation proceedings with the appropriate court were initiated for properties whose owners were unable to grant the request to donate or accept price offer for negotiated sale within a given timeframe. More available ROW and favorable weather conditions will enable DPWH to catch up and finish the 10.3-kilometer Contract Package 4 - Cabanatuan Section which is now 88 percent completed. Meanwhile, the Zaragoza Interchange Section under Contract Package 5 is at 26 percent which involves construction of 113 meters Zaragoza Interchange Bridge, 4.88 kilometers access road, two (2) pre-stressed concrete deck girder bridge with a total length of 19.4 meters, five (5) reinforced concrete box culverts for equalizer and farm passage, and seven (7) irrigation canals. Once fully completed, the 30-kilometer CLLEX will shorten the usual travel time of 70 minutes between Tarlac City and Cabanatuan City to just 20 minutes. This new expressway will also form an important east-west link for the expressway network of Central Luzon to ensure a continuous seamless traffic flow for the motoring public from Metro Manila and vice versa passing thru NLEX, SCTEX/TPLEX.   Article Courtesy of the Department of Public Works and Highways

Place your Ad Here!


Recent Articles

Company

Philippine Resources - March 23, 2023

20 Years of Integral: Celebrating Growth and Transformation

Integral, a purveyor of market-leading process control solutions in the Philippines, celebrates its 20th anniversary this 2023. The event, held in EDSA Shangri-La, was attended by the company’s employees, clients, and supply chain partners.   The celebration was a showcase of Integral’s history. But more importantly, it highlighted lessons the company learned as keys to success over the past two decades. As told from the perspective of the founders and employees, the event delivered a playful yet heart-warming glimpse into Integral's journey.

Construction

Philippine Resources - March 23, 2023

PH, Australia partner for technical cooperation for PPP

Photo: Australian Ambassador to the Philippines Hae Kyong Yu PSM. Credit: AusAmbPH Twitter Page As the Marcos administration becomes bullish in utilizing a public-private partnership (PPP) model in infrastructure projects, the Australian government will be providing its technical expertise in rolling out infrastructure projects under the PPP. Australian Ambassador to the Philippines Hae Kyong Yu PSM told the Philippine News Agency in an interview at her residence Wednesday that the embassy will be launching the Partnerships for Infrastructure (P4I) on March 24. “Infrastructure is a big area that the Philippines is focusing on, and I know President (Ferdinand R.) Marcos (Jr.) has announced that he wants to utilize PPP more where it’s possible. So we are working closely with the Philippine government to share with them how Australia has done it,” Yu said. P4I is an Australian government initiative that brings together experts from the public and private sectors as well as the academe to help Philippine government agencies involved in infrastructure development in the preparation stage of projects that would be under a PPP model. “We can help them with all the project preparation stage. How you do actual cost-benefit analysis of potential projects, and then how you prepare documents for possible procurement, tender processes, and things like that,” the envoy cited. She said that aside from the PPP Center, the P4I also aims to closely work with other agencies including the Department of Transportation, the Department of Energy, the Department of Finance, and the National Economic and Development Authority (NEDA), among others. Yu added that the Australian government will be closely working with the administration through the P4I in meeting its diverse infrastructure requirements, including roads, transport, energy, and public investment management. The Australian envoy said a number of Australian companies have been involved in infrastructure projects in the country. Early this month, NEDA Secretary Arsenio Balisacan announced that the NEDA Board approved PHP9 trillion worth of flagship infrastructure projects, with 45 of these projects possibly being funded through PPPs. “The government shall harness the financial and technical resources of the private sector, which allows the public sector to allocate its funds for greater investment in human capital development, especially to address the scarring in health and education due to the pandemic, and provided targeted assistance that protects vulnerable sectors from economic shocks,” Balisacan had said. By Kris Crismundo   Article courtesy of the Philippine News Agency

Construction

Philippine Resources - March 21, 2023

PBBM boosts transport sector thru big-ticket projects

Photo credit: Department of Transportation Several big-ticket infrastructure projects in the transportation sector have been approved or are already being implemented by the administration of President Ferdinand R. Marcos Jr., the Department of Transportation (DOTr) reported Monday. In a statement, the DOTr said the Cebu Bus Rapid Transit Project, Davao Public Transport Modernization Project, EDSA Greenways, the Light Rail Transit Line 2 (LRT-2) West Extension, and the Light Rail Transit Line 1 (LRT-1) Cavite Extension are all ongoing as of March 9 according to the National Economic and Development Authority (NEDA). These projects are among the 67 infrastructure flagship projects (IFP) that have been greenlit or are already underway out of the 194 high-impact projects under Marcos’ "Build Better More" program. In the rail sector, these approved and ongoing projects include the Metro Manila Subway Phase 1, Mindanao Rail Phase 1, Metro Rail Transit Line 3 (MRT-3) rehabilitation, Metro Rail Transit Line 4 (MRT-4), Metro Rail Transit Line 7 (MRT-7), New Cebu International Container Port, New Manila International Airport (Bulacan International Airport), North-South Commuter Railway (NSCR), Philippine National Railways (PNR) South Long Haul, and the Subic Clark Railway. The New Dumaguete Airport Development Project (Bacong International Airport) and the Integrated Flood Resilience and Adaptation (InFRA) Phase 1 have also both been approved by NEDA, with six projects awaiting approval. Last week, the NEDA Board, led by Marcos, approved 194 high-impact priority projects with a total cost of around PHP9 trillion. The board also approved amendments to the 2013 Joint Venture guidelines to support the government’s push for more investments in the country’s infrastructure. PNR suspension Meanwhile, Senate President Pro Tempore Loren Legarda has expressed alarm over an impending suspension of select PNR routes due to the NSCR, saying it will affect thousands of commuters, mostly students and workers. “The welfare of the riding public should always be prioritized yet it remains to be seen whether such proposed solutions would effectively and sufficiently address the riding public's urgent demands in time for the imminent suspension of the operations of the PNR,“ Legarda said in her explanatory note on Senate Resolution No. 546. The PNR plans to suspend operations of certain routes for up to five years to facilitate the faster construction of the 55-kilometer NSCR. The construction will start in May and PNR may suspend the routes between Governor Pascual in Malabon City and Calamba City in Laguna, and well as Alabang, Muntinlupa City to Calamba. The Tutuban, Manila-Alabang route will be suspended in October and will affect between 20,000 and 25-000 passengers daily. Legarda urged the Committee on Public Order, chaired by Senator Grace Poe, to look into the impending suspension and come up with alternative solutions.   Article courtesy of the Philippine News Agency

Place your Ad Here!

Place your Ad Here!

Join the Philippines'

Mining, Construction and Industry Community

Be the "First" to get our exclusive Digital Magazine & Newsletter.