Duterte Opens Estrella-Pantaleon Bridge

by Philippine Resources - August 02, 2021

Photo Credit: Department of Public Works and Highways

President Rodrigo Roa Duterte inaugurated on Thursday, July 29, 2021 the Estrella - Pantaleon Bridge, a modern bridge that will connect the cities of Mandaluyong and Makati within five (5) minutes.

The President was joined by Chinese Ambassador to the Philippines Huang Xilian, Department of Public Works and Highways (DPWH) Secretary Mark Villar, Senator Christopher Lawrence Bong Go, and Executive Secretary Salvador Medialdea in the symbolic unveiling of bridge marker at Rockwell, Makati City.

The event was also attended by Transportation Secretary Arthur Tugade, Finance Secretary Carlos Dominguez, MMDA Chairman Benhur Abalos, DPWH Undersecretary Emil K. Sadain, and Mandaluyong City Mayor Carmelita Abalos.

Built at a cost of P1.46 Billion, the Estrella - Pantaleon Bridge Project is one of the two (2) bridges funded by a grant of the People’s Republic of China — the other one is Binondo-Intramuros Bridge in Manila expected to be finished at the end of the year.

The President expressed his appreciation to the Chinese government’s generosity in funding the construction of this new bridge that has not only improved mobility and connectivity but also enhanced the resilience against natural disasters.

Photo Credit: Department of Public Works and Highways

Secretary Villar said that this modern bridge across Pasig River is expected to accommodate about 50,000 vehicles daily and is among the projects under the Metro Manila Logistics Improvement Network to address traffic congestion including that of EDSA.

Construction of 506.46 meters bridge began on January 2019 under the implementation of DPWH Unified Project Management Office (UPMO) Operations headed by Undersecretary

Sadain, who together with Secretary Villar were at the forefront of ensuring the quality completion despite the challenges of this project under the Build Build Build program.

While this pandemic may slowed down and disrupted the implementation of this bridge project, the DPWH UPMO Roads Management Cluster 1 Team headed by Project Director Benjamin Bautista, former Project Director Virgilio Castillo and Project Manager Melchor Kabiling and with the contractor China Road and Bridge Corporation have worked double time, added Secretary Villar.

This new four (4)-lane bridge with added aesthetic value of V-shaped piers is made of pre-stressed concrete rigid frame with corrugated steel webs, replacing the temporary two-lane box truss bridge dismantled in 2019.

Compared to the old bridge made of temporary modular steel components, the new bridge has two (2) lanes on each direction and with wider sidewalk component.

Estrella - Pantaleon Bridge has a 50.5 meters approach road on Estrella Street, 66 meters Makati approach bridge made of pre-stressed continuous girder, 146 meters main bridge and 243.96 meters approach road at Barangka Drive connected to Pantaleon Street in Mandaluyong City.

Other miscellaneous works include thermoplastic pavement markings, protective barrier and railings along both sides of the bridge, pipes for the storm water, drainage structure, and lightings.



Related Articles

Construction

Philippine Resources - July 16, 2021

Duterte Opens New Expressway in Central Luzon

Motorists will now be able to use the first 18-kilometer portion of the Central Luzon Link Expressway (CLLEX) from SCTEX/TPLEX connection in Tarlac City up to the intersection of Aliaga-Guimba Road in Aliaga, Nueva Ecija. President Rodrigo Duterte, Department of Public Works and Highways (DPWH) Secretary Mark Villar, Senator Bong Go, and Japanese Ambassador to the Philippines Kazuhiko Koshikawa led on Thursday the inauguration ceremony of the four lanes toll-free expressway project connecting the provinces of Tarlac and Nueva Ecija. The initial part of CLLEX that will be opened are the following sections covered by three contract packages: 4.10 kilometer Tarlac Section, 6.40 kilometer Rio Chico River Bridge Section including the 1.5 kilometer Rio Chico Viaduct, and Aliaga Section with up and down ramps at Guimba-Aliaga Road. This new highway project was implemented by DPWH Unified Project Management Office (UPMO) led by Undersecretary Emil Sadain and Project Director Benjamin Bautista of UPMO Roads Management Cluster 1 (Bilateral) who have worked double-time to deliver the completion of this project. CLLEX is among the key infrastructure projects with funding assistance from the Government of Japan thru the Japan International Cooperation Agency (JICA) in support of the Build, Build, Build program. The entire 30-kilometer expressway project is expected to shorten the usual travel time of 70 minutes between Tarlac City and Cabanatuan City to just 20 minutes. More than just scenic views experienced while you drive and visit the stunning places in Central Luzon, this new highway will help ensure the Philippines’ sustainability and development by addressing barriers in distance and mobility. The Build, Build, Build program continues to deliver its promise of creating infrastructure that improves the lives of Filipinos in the face of the Covid-19 pandemic and other challenges. While Build, Build, Build continued to make progress, it is also setting up the foundation in terms of infrastructure for the next generation.

Construction

Philippine Resources - July 16, 2021

Duterte: New Tarlac-Cabanatuan Expressway to Boost PH Economy

By Ruth Abbey Gita-Carlos

Construction

Philippine Resources - June 09, 2021

CLLEX up to Aliaga will open this July

Photo Credit: Department of Public Works and Highways Public Works and Highways Secretary Mark A. Villar expressed confidence that the Central Luzon Link Expressway (CLLEX) will be an efficient alternate route for the motoring public going to Nueva Ecija when it opens next month. Despite work slowdown due to the pandemic, the first 18-kilometer segment of CLLEX will be of service to motorists from SCTEX/TPLEX connection in Tarlac City up to the intersection of Aliaga-Guimba Road in Aliaga, Nueva Ecija this July 2021, declared Secretary Villar. Secretary Villar said that contract packages 1 and 2 covering Tarlac Section and Rio Chico River Bridge Section having a combined length of 10.5 kilometers are already completed while construction of 9.2 kilometers contract package 3 - Aliaga Section is 87 percent finished. Secretary Villar together with Undersecretary for Unified Project Management Office (UPMO) Operations Emil K. Sadain and Region 3 Director Roseller Tolentino personally checked on Tuesday, June 8, 2021 the project’s progress which already has an overall accomplishment of 94 percent, making sure that the road is built with quality construction materials and specifications. Construction of the ₱11.811 Billion road project funded by loan with Japan International Cooperation Agency is implemented by UPMO-Roads Management Cluster 1 headed by OIC Project Director Benjamin C. Bautista. In his report to Secretary Villar, Undersecretary Sadain said that the delivery of right of way (ROW) requirements are being fast-tracked, with the assistance of the Office of the Solicitor General (OSG) for expropriation complaints and other ROW-related cases. “We are hopeful that we will finally secure full site possession of the remaining required ROW to allow our construction activities to go on full throttle”, added Undersecretary Sadain. Expropriation proceedings with the appropriate court were initiated for properties whose owners were unable to grant the request to donate or accept price offer for negotiated sale within a given timeframe. More available ROW and favorable weather conditions will enable DPWH to catch up and finish the 10.3-kilometer Contract Package 4 - Cabanatuan Section which is now 88 percent completed. Meanwhile, the Zaragoza Interchange Section under Contract Package 5 is at 26 percent which involves construction of 113 meters Zaragoza Interchange Bridge, 4.88 kilometers access road, two (2) pre-stressed concrete deck girder bridge with a total length of 19.4 meters, five (5) reinforced concrete box culverts for equalizer and farm passage, and seven (7) irrigation canals. Once fully completed, the 30-kilometer CLLEX will shorten the usual travel time of 70 minutes between Tarlac City and Cabanatuan City to just 20 minutes. This new expressway will also form an important east-west link for the expressway network of Central Luzon to ensure a continuous seamless traffic flow for the motoring public from Metro Manila and vice versa passing thru NLEX, SCTEX/TPLEX.   Article Courtesy of the Department of Public Works and Highways


Recent Articles

Construction

Philippine Resources - September 24, 2021

DOTr, Pasay City sign deal for monorail, flyover extension

Residents and those working in Pasay City will soon enjoy easier public transportation after the Department of Transportation (DOTr) and the city government signed a deal for the construction of a monorail and extension of the Epifanio Delos Santos Avenue (Edsa)-Tramo flyover. In a live broadcast on Facebook on Wednesday, DOTr Secretary Arthur Tugade and Pasay City Mayor Emi Calixto-Rubiano signed the memorandum of agreement (MOA) for the proposed Integrated Pasay Monorail and Edsa-Tramo flyover extension project. Tugade said the project will be interoperable with the Light Rail Transit Line 1 (LRT-1), Metro Rail Transit Line 3 (MRT-3), the Edsa Busway, and the Edsa Greenways. “[Ito ay] makapagbibigay ng mas mabilis at episyenteng biyahe sa mga pasahero. Magiging mas madali na rin ang access patungong central business district (CBD) ng Pasay (This will provide fast and efficient travel to passengers. Access to Pasay CBD will also be easier),” Tugade said. Aside from its benefits to commuters, he said the project will also create jobs. “Ang paulit-ulit kong sinasabi na karugtong ng mga proyekto para sa kaunlaran ay trabaho para sa Pilipino (What I have always been saying is that development projects go hand-in-hand with jobs for Filipinos),” Tugade said. He said the project is a partnership between the DOTr, Pasay City government, and SM Prime Holdings. “Makakaasa 'ho kayong magpapatuloy ang DOTr sa pagsusulong ng mga proyekto para sa ikauunlad ng pampublikong transportasyon sa bansa (You can be rest assured that the DOTr will continue to promote projects for the development of public transportation in the country),” Tugade said. The MOA signing was witnessed by Pasay City Vice Mayor Noel del Rosario, DOTr Undersecretary for Finance Giovanni Lopez, Undersecretary for Legal Affairs Reinier Paul Yebra, Undersecretary for Railways Timothy John Batan, SM Prime Holdings President Jeffrey Lim, and other representatives from the Pasay City government and the private sector. On Sept. 7, the Pasay City government and the SM Prime Holdings made a joint presentation on the project to the DOTr. By Raymond Carl Dela Cruz   Article courtesy of the Philippine News Agency

Construction

Philippine Resources - September 24, 2021

DOTr eyes GenSan airport as alternate int'l gateway

Photo credit: Department of Transportation The Department of Transportation (DOTr) is pushing for the inclusion of the newly rehabilitated and expanded airport here as among the alternate gateways for returning Overseas Filipino Workers (OFWs) and international travelers. DOTr Secretary Arthur Tugade proposed the move on Thursday as he personally led the formal unveiling and inauguration of the city airport’s new passenger terminal building and other completed facilities. He said the city’s international standard airport can accommodate airline passengers coming in from as far as the Middle East. Tugade said it can be realized once the proposed increase in the daily cap for returning OFWs, currently at 2,000 for the Ninoy Aquino International Airport (NAIA), is approved. Once the cap is expanded, he said NAIA might “choke” with the influx of airline passengers from various countries. “If we will increase the cap, we need to expand our gateways and not limit them to Clark, Cebu, and NAIA. We can include GenSan among the gateways for travelers from Doha who are going to Manila,” he said in a press conference. He said they will propose such strategy with the airlines serving the international routes, including the Philippine Airlines, and seek the approval of the city government. The other possible alternate gateways could be the Laoag International Airport in Ilocos Norte and the Bohol-Panglao International Airport, Tugade said. The rehabilitated and expanded General Santos Airport passenger terminal building, which was completed early this month, is part of the PHP959-million upgrade implemented by the national government. The other completed components are the procurement and installation of navigational aids and the construction of the new Civil Aviation Authority of the Philippines (CAAP) administration building at the airport. Under the project, Tugade said the passenger terminal area has tripled in size from 4,000 to 12,000 square meters. “This will allow the airport to accommodate more passengers and provide them comfortable and convenient travel,” he said in his speech. A DOTr report said the larger passenger terminal building can now accommodate around 2 million passengers annually, a significant jump from the previous 800,000 per year. Tugade said the improvement at the city airport will continue next year with the upgrading of its air control tower, which he considered as “too low.” He said they will build a “higher and modernized” tower in 2022 to make it “more world-class” and can easily adjust to the needs of the airport. The official said the upgrading of the airport, which started in 2018, is among the agency and the national government’s top priorities in Mindanao. He said the initiative is part of the government’s efforts to bring more progress and economic opportunities in Mindanao, which “suffered from long years of neglect in terms of development.” Tugade said they endeavored to implement these projects despite the challenges posed by the continuing coronavirus disease 2019 (Covid-19) pandemic to pursue their goal of giving a “comfortable and convenient life” to Filipinos. “After the pandemic, we want all these developments in place and ready to benefit the people,” he said. In a video message, President Rodrigo Duterte commended the DOTr, the local government, and concerned stakeholders for completing the projects at the city airport amid the Covid-19 pandemic. He said the city has “gone a long way” in terms of the development of its air connectivity and airport facilities. “The rehabilitation and expansion of the airport passenger terminal building, among others, will truly boost General Santos City’s role as an agro-industrial and eco-tourism hub,” the President said. City Mayor Ronnel Rivera lauded the national government for helping the city realize its dream of having an international-standard airport. Aside from the expanded passenger terminal building, the airport is now capable of accommodating bigger aircraft like Boeing 737 and 747, as well as Airbus A330, A340, and A350. “(What) we are seeing now is a result of multisectoral commitment and dedication in various stages of the airport development, which includes coordination of several initiatives, preparation of the airport master plan, operations, and marketing,” he said. The mayor said the local government will continue to engage with prospective investors and airlines for the opening of more flights to and from the airport and the development of adjacent areas. He cited the proposed establishment of an aerotropolis or growth area centered on the city airport and its surrounding areas. “We are opening a wide array of opportunities, not only on the improvement of our infrastructure facilities but also in terms of investments that will generate more economic opportunities for the city and the entire region (Soccsksargen),” he said. Aside from the inauguration of the airport projects, Tugade also led the unveiling of completed initiatives at the Makar port here. The DOTr said it includes the construction of the Port Operations Building and other vital facilities, which includes a parking area, covered court, port manager’s quarter or Day Care Center, and drainage system. “The improved port of Makar will now offer safer, comfortable, and a more convenient port experience to passengers, while ensuring a faster turnaround for vessels, cargo trucks, and other ancillary service providers,” it said.   Article courtesy of the Philippine News Agency

Construction

Philippine Resources - September 22, 2021

Cebu-Cordova Link Expressway 83% Complete

Photo credit: Cebu-Cordova Link Expressway As of August 31, 2021, the construction progress of the Cebu-Cordova Link Expressway (CCLEX) project was at 83.84 percent. The P30-billion toll bridge, which will be substantially completed by the end of 2021, will use a full electronic toll system when it opens to motorists in the first quarter of 2022 to enable faster traffic flow and seamless travel. The project recently marked a milestone with the completion of the installation of all 56 stay cables that hold the main bridge deck. On September 11, the Cebu Cordova Link Expressway Corporation (CCLEC), through its contractor, installed the last and longest stay cable, which is 219 meters long. The gap on the main bridge, on the other hand, is now down to only two meters before span closure and preparations are underway for the lowering of the form travelers. These form travelers, which weigh 500 tons in each tower, were used to construct the main bridge’s pier table and deck. Also, all 434 NU (Nebraska University) girders for the entire project have already been installed. With this, the mobile launching gantry used to install the girders have been demobilized. At the Cebu South Coastal Road (CSCR) on ramp and off ramp sections of CCLEX, construction of its substructures is complete. Ongoing works are now on the installation of precast planks and the concreting of deck slab. Also finished is the 200-meter pedestrian footbridge beside the CSCR with all six prefabricated steel walkways already installed. The footbridge will start near the U-turn slot of the South Road Properties’ welcome tower and will connect to the on-ramp sidewalk of CCLEX. At the Cebu viaduct, the construction of deck slab is ongoing. The Cordova viaduct, on the other hand, is now structurally complete with its substructure already done. Installation of handrails are underway. At the causeway, embankment works continue to progress with the placing of 20 vent pipes, which equalize the flow of seawater along the Cordova Channel, is finished. Also structurally complete are the four low-level bridges along the causeway, which will provide fishermen continued access to their fishing grounds. Aside from these, works are ongoing for the toll plaza and the CCLEX Operations and Maintenance Center. CCLEX, highlighted by its iconic crosses on top of the twin pylons of the cable-stayed main bridge over the Mactan Channel, is Metro Pacific Tollways Corporation’s (MPTC) first toll road project outside Luzon. CCLEX, which will be the third link to Mactan Island from Cordova Municipality to mainland Cebu through Cebu City’s South Road Properties, has a design speed of 80 kilometers per hour (kph) and a navigational clearance or height of 51 meters to allow large vessels to pass underneath the bridge. Not only is CCLEX seen to reduce traffic and make traveling more convenient but also spur trade activities and open greater economic opportunities for Cebu and the rest of the Visayas region. CCLEX is a project of Cebu Cordova Link Expressway Corporation (CCLEC), in partnership with the local government units of Cebu City and Municipality of Cordova. CCLEC is a wholly owned subsidiary of MPTC, the toll road arm of Metro Pacific Investments Corporation (MPIC), a publicly listed infrastructure holding company and a member of the MVP Group of Companies. MPTC is the largest toll road concessionaire and operator in the Philippines, which expansion goals include establishing toll operations in the Visayas, other parts of the Philippines, and in neighboring countries notably Vietnam, and Indonesia.   Article courtesy of Cebu-Cordova Link Expressway

Join the Philippines'

Mining and Construction Community

Be the "First" to get our exclusive Digital Magazine & Newsletter.